We Deliver to the UK, EU & Beyond
Free Delivery on all UK orders
 30 Day Returns

Homeware

4 Gang Extension Lead Electrical 13 amp 2 metre Long Lead on off Switch - White

4 Gang Extension Lead Electrical 13 amp 2 metre Long Lead on off Switch - White

£9.85
Stock Status: In Stock
4 Gang Extension Lead Electrical 13 amp 2 metre Long Lead on off Switch - White
4 gang Robust construction Ideal for home or office and Christmas Lights Manufactured to BS1363/A Standards 2 metre...
Bookmark and Share
Facebook
PayPal Checkout
4 Gang Extension Lead Electrical 13 amp 2 metre Long Lead on off Switch - White

  • 4 gang
  • Robust construction
  • Ideal for home or office and Christmas Lights
  • Manufactured to BS1363/A Standards
  • 2 metre cable length

Product Description

4 Gang Extension Lead, White trailing socket with 2 metre cable. 13 amp, 4 gang. Manufactured to BS1363/A Standards.

  • Brand:
    Various
  • Condition:
    New
product review overlay image

Customer reviews

No reviews left yet
Write a review

No reviews have been left for this product, be the first to leave a review